Complete main deck renovation in the cargo tank area.
Complete main deck renovation in the cargo tank area.
Renewing of plates and stiffners with a total weight between 40 and 60 tons. Previous disassembly of all deck elements such as cargo pumps, cargo piping, heating and electrical systems, tank sensors, hatches, gangways, manifolds, etc. And subsequent assembly of all the elements in their original position.
Works carried out on several bunker type vessels, in total 5 units.
Copyrights © 2020 All Rights Reserved by Indunaval